The purpose of the Relief Sewer – Phase II project is to construct 16,475 linear feet of 42-inch through 54-inch diameter relief sewer. There are six trenchless installations to be completed as hand-mined tunneling operations using steel liner plates, a tunnel shield, and excavation methods suitable for the type of material encountered.