Description of Work - The Forest Service (FS) is soliciting offers to construct a five stall parking area, decommission approximately 3,765 FT of road, and stream channel restoration of a portion of Tunnel Brook. This project is located in Benton, NH within the White Mountain National Forest, Pemigewassett Ranger District. The road damage occurred as a result of Tropical Storm Irene. The contractor shall provide all expertise, labor, supervision, services, equipment, tools, supplies, permits, coordination with utilities, transportation, and incidentals necessary to construct a parking area, decommission the road, and do stream restoration.
Project Location - Tunnel Brook Road is located on the southerly side of Route 112 in Easton. Project area starts at Forest Service gate located approx. 1.3 miles down Tunnel Brook Road from the intersection of Route 112 (gate is after bridge crossing Tunnel Brook).
Price Range - $250,000 to $500,000.
Pre-bid Tour - A pre-bid tour is proposed on June 25, 2014. No additional pre-bid tour is scheduled. This may change so be sure to look at the solicitation material when it is posted.
Period of Performance - Work shall be completed by August 31, 2015. The Period of Performance includes pre-construction activities such as: obtaining permits, and ordering and delivery of materials; and performance of the work and includes winter shutdown.
Contractors must be registered in www.sam.gov in order to submit an offer on this project. Obtaining a DUNS number and registering in SAM are FREE.
All solicitation materials will be uploaded to this site on or around June 19, 2014. This will include work specifications, maps, drawings, and all materials needed in order to submit an offer.
Melissa A Conn, Phone 814-728-6241, Fax 814-726-1465, Email [email protected]