This contract includes:
1. Directional Drilling of approximately 10,200 m of 150 mm diameter HDPE DR 11 (to include approved tracer wire) supply and install.
2. Crossings:
Secondary Road 630, plus 2 utility R.O.W.s at this location
Secondary Road 824
Various utilities as provided in Appendix A
3. Tie-in to existing Strathcona County Pipeline.
4. Valves, fittings and related appurtenances.