Mandatory pre-bid meeting on 08/06/2009.
SCOPE OF WORK: Removal of an existing substation transformer and replacement with new; removal of existing oil switchgear and replacement with new, VFI gear; demolition associated with above; repairs to an existing primary switchgear cabinet; new PT work; new Transformer Protective Relay and associated wiring; new Medium Voltage cable, terminations and splicing and substation control power work.