Mandatory pre-bid meeting 01/25/2010.
Note: must register at site to access full RFP (registration is free).
The project involves the repaving of approximately 8 miles of existing trail and site furnishing improvements from the existing Bridge to the East City Border. Work shall include, but not be limited to: constructing, maintaining and removing temporary work zone traffic control and erosion control measures; performing all removal of structures and obstructions, clearing and grubbing; constructing trail improvements including cold planing, aggregate shoulders, and 2" porous asphalt overlay; placing pavement markings and striping; installing bollards, concrete banding, trail and bollard signage; trail maintenance including seeding, planting, and fencing; and performing additional and incidental Work as called for by the Specifications and Plans.