This federally funded project will construct a paved multi-use trail connection between the existing tunnel undercrossing and the existing Creek Trail. The project will reconstruct the existing Creek Trail from the intersection of the new paved multi-use trail Lake Park (total approx. length is 2.3 miles). The project will also construct a paved multi-use trail connecting the student housing and the main campus (approx. 0.8 miles in length).