The scope of work includes installation of traffic signal facilities, such as signal and lighting
standards, controller cabinet, pull boxes, conduits, wires and cables, etc., concrete
improvements, asphalt concrete paving, signing, striping and guardrail.
The Construction Allocation for this project is $350,000.