Construction of Drive at the intersection to improve the existing vertical curve and provide a right turn lane. Installation of 630 lineal feet of monolithic curb and sidewalk (including demolition of existing). Improvement of existing pedestrian island. Grinding existing asphalt to provide 4-inch asphalt inlay