All traffic control devices to be used on the project shall conform to the requirements of the KDOT “General Traffic Control” detail sheet (TE700, or current version). The Contractor shall be aware of the particular requirements of the item referencing “NCHRP Report 350 Crashworthy Requirements”. Certification for the same shall be received and approved by the Project Engineer prior to beginning work on the project.