The work includes the addition of ramp meters, Dynamic Message Signs (DMS), Closed Circuit Television (CCTV) cameras, Digital Upgrade of existing CCTV cameras, removal of existing Passive Acoustic Detectors and cabinets, Traffic Count Stations, fiber optic cable, and other related items.