In general the major work items include: The construction of traffic calming devices, which will include, but not be limited to the installation of speed tables, median islands, excavation and placement of base material, removal and replacement of asphalt, concrete, pavement striping, signage, provision of traffic control for the duration of the project, and other miscellaneous work as outlined in the plans and specifications.