The track and field resurfacing consists of providing a polyurethane running
track surface with structural spray finish, long jump/triple jump runway and
high jump area resurfacing and related work. The City will be responsible for
demolishing and removing the existing track.
The trench drain consists of installing a pre-cast, interlocking polyester
concrete trench drainage system around the entire track. The resurfacing
contractor shall be a member of the American Sports Builders Association.