The purpose this document is to meet both requirements of FAR 5.201 and FAR 36.213-2 requirements.
This project includes the construction of a bridge with a precast, pre-stressed voided concrete slab deck, including cast in place concrete abutments and retaining wall, bridge railing and approach railing, and other associated parts. Work also includes construction of a temporary bypass, the removal of an existing concrete low water crossing, dewatering, erosion control, installation of riprap, roadway realignment and construction, aggregate base, asphalt concrete paving, and the design and construction of stream restoration in the vicinity of the bridge. After completion of the new bridge, work includes removal of the temporary bypass road.
The estimated price of this project is $1,000,000.00 to $5,000,000.00
Patrick J. Gallegos, Phone 559 297-0706 Ext. 4830, Fax 559-294-4833, Email [email protected]