The project will include but not limited to the following major categories of work:
Asphalt Mill & Overlay (2") 13, 221 SY
6" Concrete Pavement 5,555 SY
8" Concrete Pavement 3,268 SY
Traffic Signal Installation
Storm Sewer System
D.I.P. Water Main System
TIME LIMIT: Must be completed within 240 calendar days. The north two (2) parking lots must only be closed 4 weeks and cannot be closed at the same time.