Note: non-mandatory meeting 07/12/2011.
Full RFP documents must be requested directly from issuing Agency.
The scope of work consists of a baggage claim facility located adjacent to the existing south terminal baggage claim. The facilities shall include one semi-enclosed structure, new Baggage Handling System (BHS), canopy roof structure for conveyor belt, parking, landscaping, and associated electrical, plumbing, and mechanical work. Location of project requires work be performed on both Airport Operations Area and non-AOA.