The University is opening a new academic classroom and laboratory building in the Fall Semester of 2010. Roughly 1,300 ft. of conduit needs to be run from the CTM building to the new ACL building. At least two hand holds need to be installed through this pathway. Other itmes needed include: fiber; power distribution; cat 6 patch cables; etc.