The RFP Database
New business relationships start here

Tampa Bay Sunguide Freeway Management System, Phase Iv


Florida, United States
RFP
Download the rfp file: FL_Sunguide_020510.pdf.

DISTRICT 7 Major Work : 6.3.1 - Intelligent Trans Sys. Analysis & Design 6.3.2 - Intelligent Trans Systems
Implementation 6.3.3 - Intelligent Trans Traffic Eng. Communications Minor Work : 6.3.4 - Intelligent Trans Sys. Software
Development 8.1 - Control Surveying 8.2 - Design, Right of Way, & Const. Surveying 9.1 - Soil Exploration 9.2 -
Geotechnical Classification Lab Testing 9.3 - Highway Materials Testing 9.4.1 - Standard Foundation Studies Contract :
10752 Major Project Financial Management Number(s): 40723363201 Project Description: Tampa Bay Sunguide Freeway
Management System, Phase IV: I-275 ITS from south of I-75/I-275 apex along I-75 to south of Sunshine Skyway Bridge
within the Tampa Bay area (Manatee Co.) Project Manager: Cooper, Vaughn Special Notes: The Department seeks
services to provide as a minimum: *Design ITS system for freeway management. *Provide civil, mechanical, electrical,
communications, and all other ancilliary designs necessary to produce a complete set of ITS freeway management plans.
*Prepare plans, specifications, and systems engineering management plan for the system to provide traceability and
verification of work done during construction, i.e., PSEMP, PITSA, Testing and Acceptance plan, etc. *Provide post design
services for verification and oversight into the system testing and acceptance.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP