This project will involve removal and replacement of the existing concrete pavement on the Tower Road on-ramp. It will include unclassified excavation and preparing roadway subgrade. Storm water drainage improvements will be installed. The on-ramp will be repaved with Portland cement concrete pavement. New curb and gutter will be placed along a portion of the new ramp. Pavement marking will be installed. Construction traffic control and project surveying will be required.