The work includes removing the existing twenty three-span steel girder bridge and replacing it with a fifteen-span precast prestressed concrete AASHTO Type VI girder bridge. In addition, the project includes roadway approach widening, intersection improvement, guardrail reconstruction, berm construction, irrigation line installation, pavement markings placement, and other miscellaneous work.