The proposed work at this location consists of installing new wire-tied riprap and gabion baskets along the north side of the westbound roadway embankment, and other related work. The second location begins and extends approximately 0.06 miles to the east. Proposed work at this location involves construction of a new embankment ditch along the top of the embankment, new down drains, and other related work.