Furnish labor (including detail design), materials, and equipment necessary to install a subsurface irrigation system for coverage of a 5.3 acre block. Work shall include site excavation and backfilling. All work shall be per manufacturer's recommendations and these specifications. Provide provisions for Phase 2.