Furnish all labor, materials, and equipment necessary for construction of Study Area Parking and Detention Basin which includes all site work, excavation, base and form preparation of fifty-two (52) parking spaces, installation of impervious concrete pavement, concrete curb and gutter, necessary utilities, etc., as indicated in the drawings and specifications herein. The Owner shall furnish and install all fifty-two (52) porous pavement spaces (as indicated on the plans as porous asphalt, grass pavers, permeable interlocking concrete pavers, and porous concrete) as well as hydromulch seed and/or sod all disturbed locations and therefore shall not be included in the Base Bid.