Installation of a new steel framed screen wall along the east elevation of the cooling tower platform.
Modifications to incorporate an access opening into the existing west side screen wall.
Installation of an access bridge from the Urban Life Building Main Floor.
Installation of a handrail along the Access walkway from the Urban Life Building to the Connector.