The project will include but not limited to the following major categories of work:
General construction, mechanical, electrical, and site work for remodeling approximately 14 block faces of existing sidewalks, curbs, gutters, storm drainage systems, water service, and traffic signals, and the construction of new crosswalks at 3 intersections and two mid-block crossings.