The project consists of installation of 3000 lineal feet of 8" ductile iron water main, replacement of 50 water services, boring 100 lineal feet of 16" steel casing beneath rail track, relocation of an existing pressure reducing station and performance of such additional and incidental work as called for by the Contract Documents. The engineer's estimated project cost is $520,000.