The work includes furnishing all required Best Management Practices "BMPs" (Erosion, dust and pollution control measures), excavation, archaeological monitoring, demolition and removal of the existing sewer lines, sub-grade preparation, dewatering (as required), sewage spill mitigation and control measures, installation of new PVC sewer lines, laterals and clean-outs, tie-in into the existing sewer main and existing sewer manholes, backfilling and compaction (including geotechnical monitoring), restoration of all disturbed existing improvements (including but not necessarily limited to: pavement, pavement markings, curbs, gutters, sidewalks, road signs, landscaping, fences, walls, etc) and furnishing of all required temporary construction traffic control and safety devices.