The proposed work generally consists of furnishing all labor, equipment, materials and supervision for the construction of approximately 600(±) SY of street subgrade and asphalt. Work also includes the installation of a new curb inlet and storm pipe, adjacent curb, gutter, and sidewalk, and traffic control, along with all appurtenances and other additional and incidental work as called for by the specifications and plans.