The project includes new sidewalk and curb ramps, curb and gutter (new and remove and replace), driveway replacement, approximately 740 LF of 48" reinforced concrete pipe, approximately 90 LF of 36" reinforced concrete pipe, and approximately 90 LF of 24" reinforced concrete pipe, curb inlets, manholes, 440 LF of 2" PVC waterline, 1,600 LF of 8" PVC waterline, striping, erosion control and tree protection and miscellaneous items, as more fully described in the Drawings and Specifications.