The project work includes, but is not limited to replacement of headwalls, replacing the existing culverts with 77" x 52" and 57"x 38" CSPA, stream bank grading, and associated Erosion and Sediment Control. In addition to the culvert replacement, the project also includes full depth pavement replacement associated with culvert replacement, and a mill and overlay.