In general, this project will consist of the removal of existing deteriorated curb and gutter and asphalt paving and construction of 400 lineal feet concrete curb and gutter, one A.D.A. curb ramp, 1000 square yards asphalt paving, concrete sidewalk and other incidental items related to the construction as specified in the plans and the specifications.