The improvements consist of the following approximate quantities of materials:
1 LS General Conditions 4 EA Type C Poles/Fixtures
1 LS Saw Cut Existing 960 LF 240 Circuitry
2,230 CY Excavation/Embankment 120 LF 2" Conduit Installed
5,195 SY Subgrade Preparation 800 LF Trenching
3,315 TON Aggregate Base - Class 5 1 EA New Feedpoint
1,220 TON Class 29 Hot Bituminous Pavement 1 EA Spare Pole
18,125 Gal PG 58-28 Asphalt Oil 1 EA Spare Luminaire
1,791 LF Curb & Gutter 1 LS Materials Testing
301 SY 8" Concrete Valley Gutter 1 LS Traffic Signs
5,195 SY Geotextile Fabric Type R-1 974 LF 18" RCP Storm Drain
168 LF 15" RCP Storm Drain 5 EA Storm Manhole
7 EA Catch Basin Manhole 1 EA Catch Basins