Project consists of constructing a new two lane roadway underneath the Railway. The work includes but is not limited to: clearing and grubbing, removal of unsuitable materials, structural excavation, roadway excavation, dewatering, railroad shoofly embankment, utility relocation, grading, storm installation, water line installation, storm water pond facility, storm water pump station, a two span railroad bridge, shoring walls, retaining walls, paving, curb and gutter, street lighting, channelization, signing and other work necessary to complete the work as specified and as shown in the contract documents.