The work under this project consists of drainage improvements including ditch excavation, grading and seeding, installation of approximately 2,400 LF o fRCP and 22 inlet structures, installation of concrete sidewalk, driveway aprons and curb and gutter, some asphalt patching and asphalt resurfacing, replacement or adjustment of DI water main and driveway removal and replacement, and asphalt resurfacing.