This document has expired, therefore the above link may no longer work.
This item shall consist of furnishing all materials, labor, equipment and incidentals necessary to saw cut existing base failures as indicated on plans; removing and reshaping sub-base; and installing Type D Hot Mix Asphalt Concrete Pavement.