Pre-bid meeting 12.15.2009.
Sealed bids are invited for rehabilitation of the Stormwater Management Pond as summarized below.
1) Replacement of the existing Stormwater Management Pond discharge
barrel with portions located in County owned public open space, DelDOT right-of-way, and County owned access
easements. Work will include the replacement of the existing discharge barrel; connection of new barrel;
connection of new barrel to existing outlet structure; and installation of riprap stilling basin at outlet of new discharge
barrel, in accordance with the contract specifications and drawings.