Mandatory pre-bid meeting 12.01.2009.
Project consists of two Stormwater Improvement Projects to be installed in 2010:
Phase 1 Install approximately 530 LF of storm drain improvements including pipe, catch basins, an energy dissipater outlet structure and restoring associated sidewalk, curb and gutter, asphalt and landscaping.