The project consists of installing approximately 58 lineal feet of 6'x3' reinforced concrete box storm drain pipe, removing and replacing 86 lineal feet of concrete channel lining, installing two headwalls, clearing and grubbing, removing and replacing curb, gutter, sidewalk, asphalt concrete, and fencing, and doing all other work specified on the plans and in the specifications.