Update campus survey to include detailed topography of the five existing storm water ponds on the campus. Include sufficient point (locations and elevations) and descriptions to allow the measurement of the embankment, emergency spillways, pond interior, pond bottom, and normal water elevations. Also include a detailed drawing indicating the dimensions and elevations of the pond spillway risers including all weir and orifice elevations and sizes.