The RFP Database
New business relationships start here

Statement of Qualifications: Construction Manager at Risk


Maine, United States
Government : Municipal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

The selected CM@R will be required to interact with City staff, Developers, Design Team, Program Manager and others during the pre-construction phase. Interaction will include coordinating design review and preparation of estimates. The selected Respondent will also be required to participate in value engineering and other collaborative cost reduction and design modification efforts as required to achieve a project design that conforms to the cost/budget limitations.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP