Actual Estimate is Less than $100,000. Project is being advertised formally in case work actually exceeds the $100,000 limit for Small Procurements. This can only be done if additional funding becomes available. The selected contractor should be prepared to provide an estimate that is under $100,000. Produce standard drwaings and standard specifications applicable to the state. The package of standards will assist design engineers when they develop erosion and sediment control plans for contracts. The standards will also make it possible to improve the basis of payment in construction contracts and facilitate Project Engineer's ability to enforce the contract with regard to erosion and sediment control measures. An expected outcome is improved storm water permit compliance and decreased contract costs. Examples of practices where standard drawings and/or specifications are needed are: check dams, sediment bains, fiber rolls, stabilized construction exits, rolled erosion control producs and hydraulic erosion control products.