All work required to construct the Stadium improvements including site preparation and removals. Preparation of the base, drainage and stone layers for the artificial turf field; installation of a synthetic infill turf multipurpose athletic field surface; installation of a black synthetic "accelerator" track surfacing system, bleachers, chain link fencing and gates; iron fence preparation and painting, relighting and other related work.