The RFP Database
New business relationships start here

Sputter Deposition System


Texas, United States
Education : University
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Vendor is expected to provide at least the minimum performance as outlined in the specifications and to meet the performance objectives of the equipment. Additionally, the vendor is expected to perform a functional test, performed by a qualified technician, prior to shipment, as well as provide set-up in the lab upon delivery. The deposited metal film should have good electrical conductivity and the deposited dielectric materials should have dielectric constants as high as possible.

    1. Home
    2. Articles
    3. Login or Register

    4. Search

    5. Add/Announce your RFP