Sprinkler Obstruction Inspection Sources Sought


New Hampshire, United States
Government : Federal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Seeking contractors who can perform a sprinkler obstruction inspection job

TASK 1:
Perform an obstruction investigation on wet pipe sprinkler system per NFPA 25, Chapter 14 and including the requirements of Annex D.
The contractor is to test for Microbiologically Influenced Corrosion (MIC) in the system.
This is for a three level facility, rated for health care occupancy.
The system must be taken out of service for the work of the project each day, and restored to service at the end of the work day. At no time is the system to be left out of service when the contractor is not present.
Provide fire watch for all impairments of the sprinkler system in performance of the work of this contract per NFPA 101, 3.3.97.

TASK 2:
Provide AutoCAD updated plans of the existing sprinkler system in facility.
AutoCAD 2014 or earlier version preferred.
Floor plans of the building for overlay of the system will be provided.
The plans should show details of the system (list not inclusive): head locations, pipe sizes and locations, branches, special applications heads (high temperature, as an example), valve layouts, drain points, fire department connections, etc.