The project consists of slip lining the four 36 inch diameter existing corrugated metal pipe outlets with 30 inch high density polyethylene pipe, grouting the annular space and placement of stone fill, concrete repairs to the upstream concrete headwall, pressure cleaning and sealing of the concrete on the spillway.