Project Description:
This project includes, but shall not be limited to the Demolition of the L31BR01 (L31N) Bridge and the Demolition/Replacement of the C14BR01 (Aztec) Bridge. C14BR01 Bridge - Demolition and replacement includes the following: Demolish and remove the existing Aztec bridge, reshape banks as per the site plan, construct new precast pre-stressed panel bridge with approach slabs, install new riprap, install guardrail and vehicular barrier gate, restore disturbed existing greenway, place new sod. L31BR01 Bridge - Demolition includes the following: demolish and remove the existing L31 N Bridge.