20 ILCS 3855/1-56 commissions an engineering and cost study for a proposed synthetic natural gas plant, and requires the Illinois Power Agency to review the facility report. This solicitation seeks proposals from qualified firms to assist the Agency in evaluating the study in a timely fashion.