The project consists of the removal and replacement of concrete slope paving, removal and replacement sidewalks and curb and the installment of the concrete trough as indicated on the drawings. The project also includes milling and asphalt overlay, install reinforced concrete pipes, ditch interceptor structures and traffic control.