The work under this project includes benching into the existing slope, adding fill material, mini benching for erosion control, slope rounding, and slope flattening. Also included in the work are pipe culvert extensions and remediation of existing pipe culverts, Class II seeding, erosion control elements of disturbed areas, and other related items.