THE SOLICITATION FOR THIS PROJECT WILL BE POSTED ON OR ABOUT
JULY 18, 2014
Description: The Wallowa-Whitman N.F. desires to obtain quotes to design, provide, and install an off-grid hybrid generator and photovoltaic (PV) power system at the Sled Springs Work Center. The work center is comprised of three five-person bunkhouses, one mess hall, one warehouse, one storage building with power (two without power), one generator shed, an onsite water system, and onsite wastewater systems. All buildings, with the exception of two storage buildings are connected to the existing off-grid power system. This system is comprised of 16 60-watt PV panels, a single-phase 16 kW LPG-fired generator and 16 3-volt deep cell batteries. There are also two DC-AC power inverters that take 48-volt DC power from the battery bank and send it to the site 120-volt AC power system. In addition, there is a separate three-phase 15 kW LPG-fired generator that powers the 5 HP well pump and control panel.
Andrea J. Stanbro, Contract Specialist, Phone 541-969-3554 or 541-523-1252, Fax 541-523-6393, Email [email protected] - Lorrie D. Hill, Procurement Technician, Phone (541) 523-1233, Fax (541) 523-6393, Email [email protected]