Site Improvements Park Playground

  1. This RFP had a pre-bid event.


Washington, United States
Government : Municipal
RFP
Go to the link
This document has expired, therefore the above link may no longer work.

Construction of a playground site. The work includes but is not limited to sod removal, excavation and removal of soil, grading, concrete work and site restoration. This project does not include the installation of the playground equipment or playground resilient surfacing. Concrete work includes installation of sidewalks, playground curb/mow edge and playground subsurface pad below the resilient surfacing. Restoration work includes import of fill materials, grading and installation of sod.